We are proud to be partnering with nbn® once again, to roll out projects under the Regional Connectivity Program. To find out more about the Regional Connectivity Program projects click here.
We are proud to be partnering with nbn® once again, to roll out projects under the Regional Connectivity Program. To find out more about the Regional Connectivity Program projects click here.
As part of the Regional Connectivity Program, a number of premises in your area have been selected to be included in a Fibre to the Premise (FTTP) technology switch. As part of the technology switch, technicians will be required to install equipment within the boundary of your property.
To ensure we have the correct contact details for you and can contact you to arrange equipment installation at your property please click on the link below and fill out the form.
Further information about the rollout, including the type of equipment that will be installed, is outlined below:
As part of the Regional Connectivity Program, a number of premises in your area have been selected to be included in a Fibre to the Premise (FTTP) technology switch.
Co-funded by nbn, government and business, this rollout will provide a full fibre connection to your home or business, enabling a faster and more reliable nbn experience.
Stage 1 – Survey
Stage 2 – Construction
Stage 3 – Connection
Once the equipment has been installed and tested, you will be notified to contact your Retail Service Provider (RSP) to make the switch to your new fibre connection.
What equipment will be installed at my house or business?
There will be equipment installed both inside and on the outside of your premises. The diagram below indicates the location and dimensions of the equipment.
In some instances, we may need to fix, replace, or install the lead-in conduit from the Council nature strip to the side of your dwelling. If necessary, this will be discussed with you prior to works commencing.
Yes, Ventia will arrange a suitable time with you to install the internal equipment. External equipment can take place while you are not at home, however, all equipment is usually installed on the one day.
In some instances, we may need to fix, replace, or install the lead-in conduit from the Council nature strip to the side of your dwelling. If necessary, this will be discussed with you prior to works commencing.
Approximately three hours depending on the location of the equipment and whether any civil activities need to take place. In some instances, we may need to fix, replace, or install the lead-in conduit from the Council nature strip to the side of your dwelling. If necessary, this will be discussed with you prior to works commencing.
No, you will receive notification from nbn as to when you are able to contact your Retail Service Provide (RSP) to switch to your Fibre to the Premise connection.
There is no cost for the equipment installation and the nbn equipment itself. There may be costs associated with your Retail Service Provider (RSP) to connect you to their service. This may vary between RSP’s and the plans that they offer.
Go here: nbn.com.au/regionalfttp
You can contact us directly either via phone on 1300 275 799 or email stakeholder.telco@ventia.com